Culvert Replacement at the Omega Culvert in Gerringong.
Key Elements:
- Plant & Equipment delivery and transport to remote site.
- Grout fill existing stormwater pipe under the tracks.
- Fibrecrete shotcrete to the upper and lower culverts.
- Rocks to lower culvert channel surface.